Archive for April, 2008

Back in the saddle again

Friday, April 25th, 2008

Just a quick note to inform everyone that I am back after 2 surgeries. Still healing but all has come out well. As I begin to ramp up again, I am preparing for a trip to Australia, India, and China to teach Special Characteristics, APQP and FMEA. I just finished a teaching an FMEA course at John Deere for the SQE group. This was a very fun class for me as the group was dynamic and had many questions. I hope to hear more from all of you through email as such in the near future as we continue on our never ending relentless pursuit of quality improvement.

RPN’s can be evil

Friday, April 11th, 2008

What do I mean by this statement? Using RPN thresholds to take actions is not the intent of the FMEA tool. This is according to AIAG, SAE and other authorities. There are three paths that one takes when developing an FMEA:

  1. Severity first when 9 or 10
    • Take action to error proof to eliminate the Failure Mode
  2. High Occurrence (4 or higher) when linked to higher severity 5 or more
    • Take action to error proof the cause or make it more capable
  3. Detection number too high greater than 3 when a Cause and Failure Mode combination indicates testing or inspection for a probable cause is not adequate.
    • Take action to improve testing (DFMEA) or Inspection methods (PFMEA)

RPN’s are then assigned to the Actions from the three above action drivers. The new RPN calculated after the action is compared to the RPN assigned to the action to see what the delta or difference is. Improvement is expected in the category that the action was developed.

If there are any comments to this strategy please write and comment or give us a call at (248) 280-4800. (more…)